top of page
Vancouver News
Latest News
"I Think It's in Email": The Five Words That Cost Every Project More Than They Should
There is a sentence you can hear in almost any project status meeting. Someone asks where the approval is, or the latest drawing, or the decision from three weeks ago. The answer comes back: "I think it's in email." Five words said a thousand times a day across every industry — and they are among the most expensive words in project work. They are expensive not because of the one document that is hard to find. They are expensive because of what the phrase reveals: a diagnosis

Vancouver News
Jul 163 min read
The Only Advantage That Gets Stronger When You Get Busier
A four-person firm beat a sixty-person firm to a contract award. Not on price — they were not the cheapest. Not on talent — the larger firm had no shortage of it. The evaluation committee asked why a similar project three years earlier had changed approach halfway through. The small firm answered in about a minute: the decision, the date, the reasoning, the cost. The large firm said they would follow up. There was no follow-up that mattered. Why Large Organizations Can Afford

Vancouver News
Jul 163 min read
The Schedule With Four Keepers and No Owner
The project schedule said steel erection started Monday. It had said that for five weeks. Steel had not started. Nobody had lied. Four people were maintaining that schedule in four separate files — and each one assumed the others were posting the true version. The overrun did not begin the day steel slipped. It began the day the schedule acquired its fourth editor and lost its last owner. How a Well-Run Project Produced Four Conflicting Schedules The project was not poorly ma

Vancouver News
Jul 163 min read
Nine Days of Archaeology: Why Your Board Pack Takes So Long to Write
An executive director spends nine days assembling a forty-page board pack. The board reads it in twenty minutes, asks two questions the pack had already answered, and approves everything. She does this four times a year. That is thirty-six days annually — nearly seven weeks — consumed by a task that looks like writing but is almost entirely something else. Break down where the time actually goes. Roughly four and a half days hunting for numbers that already exist somewhere: a

Vancouver News
Jul 153 min read
Canada's Raised Disbursement Quota: Why Foundations Now Govern by Their Records
In 2023, Ottawa changed a single number and reshaped how Canada's philanthropic sector operates. The disbursement quota — the minimum share of assets a registered foundation must grant out each year — rose to 5 percent on holdings above $1 million, up from 3.5 percent. The intent was to push more charitable dollars into circulation. According to Imagine Canada's early analysis, the change released approximately $711 million in new grants over its first two years, roughly $605

Vancouver News
Jul 153 min read
When the Blueprint Isn't Enough: How Large-Scale Airport Builds Depend on Their Records
Toronto Pearson moved 46.8 million passengers in 2024. It is building for roughly 65 million a year by the early 2030s. The Greater Toronto Airports Authority has launched Pearson LIFT — Long-term Investments in Facilities and Terminals — a decade-long capital program whose first phase alone is worth approximately $3 billion. New runways, a high-speed taxiway, over 30 kilometres of baggage belts, and 20,000 smart airfield lights. The engineering scope is clear. What gets less

Vancouver News
Jul 153 min read
One Name Is Not a Workflow: The Single-Approver Problem in Capital Projects
Every capital project has at least one approval that routes to exactly one person with no backup. You will not find it until that person is unreachable at the worst possible moment. Here is what a resilient approval chain actually requires.

Vancouver News
Jul 143 min read
BC's Forestry Permit Reform Doesn't Erase Obligations — It Moves Them
British Columbia is weighing whether to abolish cutting permits. Removing the permit does not remove the obligation. It shifts the burden of proof directly onto the licensee's own record — and most companies are not ready for that shift.

Vancouver News
Jul 143 min read
A Fair Process You Cannot Prove Is No Process at All
In public procurement, a fair competition that leaves no documentable record is treated exactly the same as one that never happened. Here is what a defensible file must be able to answer on its own.

Vancouver News
Jul 143 min read
58,000 Beds and a Paper Trail: Why Long-Term Care Construction Lives or Dies on Its Records
There is a bed on a funding announcement and there is a bed a resident actually moves into, and the distance between the two is measured in records. A long-term care home does not open because the money was promised. It opens because a rezoning was approved, a design met the ministry's standards, a construction contract closed, thousands of inspections and change orders were tracked, and a licence was granted against a file that proved every requirement was met. Miss a docume

Vancouver News
Jul 134 min read
The Plan Was Fine. The Delivery Wasn't. Why Capital Projects Fail Where No One Is Looking
Almost no capital project fails on paper. The business case was sound, the budget was defensible, the schedule was achievable, and everyone in the room approved it. Two years later it is over budget, behind schedule, and nobody can quite say when it went wrong. The plan did not fail. The delivery did. This is the most expensive misdiagnosis in capital project management: treating overruns as a planning problem and pouring ever more effort into better plans, longer schedules,

Vancouver News
Jul 134 min read
When the Dam Must Never Fail: Tailings Safety Is a Governance Discipline, Not Just an Engineering One
A tailings dam is one of the few structures in the industrial world that is expected to hold forever. It contains mine waste and process water, sometimes for generations after the mine itself has closed. When it fails, the consequences are catastrophic and irreversible. Yet the way most organisations manage tailings safety focuses almost exclusively on the engineering side of the equation — and misses the part that fails silently. The part that fails silently is the record. T

Vancouver News
Jul 134 min read
You Earn a Return on the Capital You Can Prove: The Rate Base as a Records Discipline
A regulated utility does not simply spend money and pass the bill to its customers. It invests in capital assets — poles, wires, substations, pipelines, meters, control systems — and then asks a regulator for permission to earn a return on that investment. The value the regulator accepts is called the rate base, and it is the single most important number in the business. But the rate base is not a spending total. It is an evidentiary claim: every dollar included must be shown

Vancouver News
Jul 124 min read
The Renewal Backlog Is a Records Problem Before It Is a Construction One
Canada's post-secondary institutions are carrying a deferred maintenance problem that has been decades in the making. The buildings that went up in the postwar boom and again in the early 2000s are now aging simultaneously, generating a wave of system failures, end-of-life replacements, and envelope repairs that no single year's capital budget can absorb. Renewal funding, after years of scarcity, is beginning to arrive at scale. The question that will determine how well that

Vancouver News
Jul 124 min read
The Data Room Decides the Deal: Why a Developer's Record Is Its Financing
Two developers bring similar projects to the same lender in the same month. One walks in with a complete, current data room — title, permits, pro forma, budget, contracts, consultant reports, and a clean track record, all organized and reconcilable. The other has most of it, somewhere, scattered across email threads, a shared drive, and three consultants' inboxes. The first is in diligence within a week and closes on schedule. The second spends months assembling and reconcili

Vancouver News
Jul 123 min read
Where Approvals Actually Stall: What the Data Shows When You Measure Every Stage
Ask a project team where approvals get stuck and you will typically receive five confident, contradictory answers. Contracts says the delay is in technical review. Technical review says it is waiting on budget. Finance says the executive queue is the problem. The executive says the files never arrive complete. Everyone is partly right, and no one is measuring anything. The intuition-versus-data gap in approval workflows is one of the most reliably expensive blind spots in cap

Vancouver News
Jul 123 min read
The $1.3-Billion Backlog: Why University Capital Renewal Is a Governance Problem Before It Is a Construction One
Canada's universities are carrying deferred-maintenance backlogs measured in the billions. Renewal money is finally returning after years of scarcity. But the first question that money asks is not which building is oldest — it is which building failure would cost the most. That is a question about evidence, not construction. The University of Toronto reported a deferred-maintenance backlog of roughly $1.3 billion on its St. George campus alone. In 2025, the institution launch

Vancouver News
Jul 124 min read
One Authority, Forty Buildings, One Standard: The Multi-Site Records Problem in Health Care
A regional health authority might operate forty buildings — hospitals, ambulatory clinics, long-term care homes, diagnostic labs — spread across hundreds of kilometres. Each was built at a different time, by a different contractor, under a different standard. Somewhere in that sprawl is the drawing that shows which wall can be safely cut into. The question is whether anyone can find it before the saw comes out. This is the defining records challenge of a multi-site health aut

Vancouver News
Jul 123 min read
When the Mine Closes, the Record Is Just Getting Started
There is an uncomfortable arithmetic at the centre of every mine closure plan. The operating life of a mine — the period when crews are present, systems are current, and institutional memory is fresh — rarely exceeds two decades. The post-closure monitoring obligation, by contrast, runs for fifty years or more. The record has to outlive every actor who created it: the crew, the contractor, the software, and often the company itself. That gap — between who made the record and

Vancouver News
Jul 124 min read
The Retention Schedule Most Public-Sector Teams Are Running Without
Two questions sink most public-sector records programs. The first: are we keeping something we were legally required to destroy? The second: did we destroy something we were legally required to keep? A retention schedule is the document that answers both — and a surprising number of teams are still running without one. Done well, a retention schedule turns "keep everything forever, just in case" into a defensible, repeatable routine. Done poorly — or not at all — it leaves or

Vancouver News
Jul 123 min read
bottom of page